PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Constructing the Slip forms at Elev. 7-Stair -4,5 Facing East (800x600).jpg Erecting Derrick -1 Facing South -2 (800x600).jpg Erecting Derrick -1 Facing South (800x600).jpg Erecting Derrick -1 Facing West (800x600).jpg Install rebar mats at Elev. 7-Stair -4,5  (800x600).jpg Moving the site fence past the site walk at Rahway Ave. Facing South (800x600).jpg Site Fence past the side walk Facing South-East (800x600).jpg Steel for Derrick -1 Facing South.jpg
Previous pageNext page Install rebar mats at Elev. 7-Stair -4,5  (800x600)
Install rebar mats at Elev. 7-Stair -4,5 (800x600)